Lune

FOCS2020顶会

Scheduling Precedence-Constrained Jobs on Related Machines with Communication Delay

Biswaroop Maiti, Rajmohan Rajaraman, David Stalfa, Zoya Svitkina, Aravindan Vijayaraghavan

2020年份
14被引次数
3顶会引用

摘要

We consider the problem of scheduling precedence-constrained jobs on uniformly-related machines in the presence of an arbitrary, fixed communication delay. Communication delay is the amount of time that must pass between the completion of a job on one machine and the start of any successor of that job on a different machine. We consider a model that allows job duplication, i.e. processing of the same job on multiple machines, which, as we show, can reduce the length of a schedule (i.e., its makespan) by a logarithmic factor. Our main result is an approximation algorithm for makespan with approximation ratio polylogarithmic in the number of machines and the length of the communication delay, assuming the minimum makespan is at least the delay. Our algorithm is based on rounding a linear programming relaxation for the problem, which includes carefully designed constraints capturing the interaction among communication delay, precedence requirements, varying speeds, and job duplication. To derive a schedule from a solution to the linear program, we balance the benefits of duplication in satisfying precedence constraints early against its drawbacks in increasing overall system load. Our result builds on two previous lines of work, one with communication delay but identical machines (Lepere, Rapine 2002), and the other with uniformly-related machines but no communication delay (Chudak, Shmoys 1999). We next show that the integrality gap of our mathematical program is polylogarithmic in the communication delay. Our gap construction employs expander graphs and exploits a property of robust expansion and its generalization to paths of longer length, which may be of independent interest. Finally, we quantify the advantage of duplication in scheduling with communication delay. We show that the best schedule without duplication can have a larger makespan than the optimal with duplication by a logarithmic factor. Nevertheless, we present a polynomial time algorithm to transform any schedule to a schedule without duplication at the cost of an increase in makespan polylogarithmic in the number of jobs and machines. Together with our makespan approximation algorithm for schedules allowing duplication, this also yields a polylogarithmic-approximation algorithm for the setting where duplication is not allowed.

问问这篇 Paper

智能体会读完全文。

Lune 把这篇 Paper 索引到了每一个公式,引用它的顶会 Paper 也一样。你提问,回答直接引用原文。

可以从这些问题问起

智能体调用

Luneget_paper_fulltext

在 Lune 里问

免费开始,无需绑卡

引用它的顶会 Paper3

问问它们各自怎么用它

它引用的顶会 Paper1

相关 Paper

黄昏的海面,两侧是细线勾勒的悬崖