Scheduling Precedence-Constrained Jobs on Related Machines with Communication Delay
Biswaroop Maiti, Rajmohan Rajaraman, David Stalfa, Zoya Svitkina, Aravindan Vijayaraghavan
摘要
We consider the problem of scheduling precedence-constrained jobs on uniformly-related machines in the presence of an arbitrary, fixed communication delay. Communication delay is the amount of time that must pass between the completion of a job on one machine and the start of any successor of that job on a different machine. We consider a model that allows job duplication, i.e. processing of the same job on multiple machines, which, as we show, can reduce the length of a schedule (i.e., its makespan) by a logarithmic factor. Our main result is an approximation algorithm for makespan with approximation ratio polylogarithmic in the number of machines and the length of the communication delay, assuming the minimum makespan is at least the delay. Our algorithm is based on rounding a linear programming relaxation for the problem, which includes carefully designed constraints capturing the interaction among communication delay, precedence requirements, varying speeds, and job duplication. To derive a schedule from a solution to the linear program, we balance the benefits of duplication in satisfying precedence constraints early against its drawbacks in increasing overall system load. Our result builds on two previous lines of work, one with communication delay but identical machines (Lepere, Rapine 2002), and the other with uniformly-related machines but no communication delay (Chudak, Shmoys 1999). We next show that the integrality gap of our mathematical program is polylogarithmic in the communication delay. Our gap construction employs expander graphs and exploits a property of robust expansion and its generalization to paths of longer length, which may be of independent interest. Finally, we quantify the advantage of duplication in scheduling with communication delay. We show that the best schedule without duplication can have a larger makespan than the optimal with duplication by a logarithmic factor. Nevertheless, we present a polynomial time algorithm to transform any schedule to a schedule without duplication at the cost of an increase in makespan polylogarithmic in the number of jobs and machines. Together with our makespan approximation algorithm for schedules allowing duplication, this also yields a polylogarithmic-approximation algorithm for the setting where duplication is not allowed.
问问这篇 Paper
智能体会读完全文。
Lune 把这篇 Paper 索引到了每一个公式,引用它的顶会 Paper 也一样。你提问,回答直接引用原文。
引用它的顶会 Paper3
- On the Hardness of Scheduling With Non-Uniform Communication DelaysSami Davies, Janardhan Kulkarni, Thomas Rothvoss, Sai Sandeep 等SODA 2022 · 被引用 4 次
- ZipMoE: Efficient On-Device MoE Serving via Lossless Compression and Cache-Affinity SchedulingYuchen Yang, Yaru Zhao, Pu Yang, Shaowei Wang 等ICML 2026 · 被引用 3 次
- SPADE: Signal-Aware DAG Scheduling and Dynamic Provisioning for Data Processing ClustersAdam Lechowicz, Rohan Shenoy, Noman Bashir, Mohammad Hajiesmaili 等OSDI 2026
它引用的顶会 Paper1
相关 Paper
- Scheduling with Communication Delays via LP Hierarchies and ClusteringSami Davies, Janardhan Kulkarni, Thomas Rothvoss, Jakub Tarnawski 等FOCS 2020 · 被引用 10 次
- Scheduling with Communication Delays via LP Hierarchies and Clustering II: Weighted Completion Times on Related MachinesSami Davies, Janardhan Kulkarni, Thomas Rothvoss, Jakub Tarnawski 等SODA 2021 · 被引用 15 次
- Towards PTAS for Precedence Constrained Scheduling via Combinatorial AlgorithmsShi LiSODA 2021 · 被引用 5 次
- An Approximation for Job Scheduling on Cloud with Synchronization and Slowdown ConstraintsDejun Kong, Zhongrui Zhang, Yangguang Shi, Xiaofeng GaoINFOCOM 2023 · 被引用 2 次
- Minimizing Completion Times for Stochastic Jobs via Batched Free TimesAnupam Gupta, Benjamin Moseley, Rudy ZhouSODA 2023 · 被引用 1 次