Scheduling with Communication Delays via LP Hierarchies and Clustering
Sami Davies, Janardhan Kulkarni, Thomas Rothvoss, Jakub Tarnawski, Yihao Zhang
摘要
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by P | prec, c | Cmax, if two dependent jobs are scheduled on different machines, then at least c units of time must pass between their executions. Despite its relevance to many applications, this model remains one of the most poorly understood in scheduling theory. Even for a special case where an unlimited number of machines is available, the best known approximation ratio is 2/3·(c+1), whereas Graham's greedy list scheduling algorithm already gives a ( c+1) -approximation in that setting. An outstanding open problem in the top-10 list by Schuurman and Woeginger and its recent update by Bansal asks whether there exists a constant-factor approximation algorithm. In this work we give a polynomial-time O(logc·logm)-approximation algorithm for this problem, where m is the number of machines and c is the communication delay. Our approach is based on a Sherali-Adams lift of a linear programming relaxation and a randomized clustering of the semimetric space induced by this lift. The full version of this paper is available on arXiv.
问问这篇 Paper
智能体会读完全文。
Lune 把这篇 Paper 索引到了每一个公式,引用它的顶会 Paper 也一样。你提问,回答直接引用原文。
引用它的顶会 Paper4
- On the Hardness of Scheduling With Non-Uniform Communication DelaysSami Davies, Janardhan Kulkarni, Thomas Rothvoss, Sai Sandeep 等SODA 2022 · 被引用 4 次
- ZipMoE: Efficient On-Device MoE Serving via Lossless Compression and Cache-Affinity SchedulingYuchen Yang, Yaru Zhao, Pu Yang, Shaowei Wang 等ICML 2026 · 被引用 3 次
- Additive Approximation Schemes for Low-Dimensional EmbeddingsPrashanti Anderson, Ainesh Bakshi, Samuel B. HopkinsSODA 2026
- SPADE: Signal-Aware DAG Scheduling and Dynamic Provisioning for Data Processing ClustersAdam Lechowicz, Rohan Shenoy, Noman Bashir, Mohammad Hajiesmaili 等OSDI 2026
它引用的顶会 Paper1
相关 Paper
- Scheduling with Communication Delays via LP Hierarchies and Clustering II: Weighted Completion Times on Related MachinesSami Davies, Janardhan Kulkarni, Thomas Rothvoss, Jakub Tarnawski 等SODA 2021 · 被引用 15 次
- Scheduling Precedence-Constrained Jobs on Related Machines with Communication DelayBiswaroop Maiti, Rajmohan Rajaraman, David Stalfa, Zoya Svitkina 等FOCS 2020 · 被引用 14 次
- Towards PTAS for Precedence Constrained Scheduling via Combinatorial AlgorithmsShi LiSODA 2021 · 被引用 5 次
- A Subexponential Time Algorithm for Makespan Scheduling of Unit Jobs with Precedence ConstraintsJesper Nederlof, Céline M. F. Swennenhuis, Karol WegrzyckiSODA 2025
- Santa Claus meets Makespan and Matroids: Algorithms and ReductionsÉtienne Bamas, Alexander Lindermayr, Nicole Megow, Lars Rohwedder 等SODA 2024 · 被引用 3 次
