Lune

FOCS2020顶会

Scheduling with Communication Delays via LP Hierarchies and Clustering

Sami Davies, Janardhan Kulkarni, Thomas Rothvoss, Jakub Tarnawski, Yihao Zhang

2020年份
10被引次数
4顶会引用

摘要

We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by P | prec, c | Cmax, if two dependent jobs are scheduled on different machines, then at least c units of time must pass between their executions. Despite its relevance to many applications, this model remains one of the most poorly understood in scheduling theory. Even for a special case where an unlimited number of machines is available, the best known approximation ratio is 2/3·(c+1), whereas Graham's greedy list scheduling algorithm already gives a ( c+1) -approximation in that setting. An outstanding open problem in the top-10 list by Schuurman and Woeginger and its recent update by Bansal asks whether there exists a constant-factor approximation algorithm. In this work we give a polynomial-time O(logc·logm)-approximation algorithm for this problem, where m is the number of machines and c is the communication delay. Our approach is based on a Sherali-Adams lift of a linear programming relaxation and a randomized clustering of the semimetric space induced by this lift. The full version of this paper is available on arXiv.

问问这篇 Paper

智能体会读完全文。

Lune 把这篇 Paper 索引到了每一个公式,引用它的顶会 Paper 也一样。你提问,回答直接引用原文。

可以从这些问题问起

智能体调用

Luneget_paper_fulltext

在 Lune 里问

免费开始,无需绑卡

引用它的顶会 Paper4

问问它们各自怎么用它

它引用的顶会 Paper1

相关 Paper

黄昏的海面,两侧是细线勾勒的悬崖