Hierarchy-Based Algorithms for Minimizing Makespan under Precedence and Communication Constraints

Janardhan Kulkarni, Shi Li, Jakub Tarnawski, Minwei Ye

2020年份
12被引次数
3顶会引用

摘要

We consider the classic problem of scheduling jobs with precedence constraints on a set of identical machines to minimize the makespan objective function. Understanding the exact approximability of the problem when the number of machines is a constant is a well-known question in scheduling theory. Indeed, an outstanding open problem from the classic book of Garey and Johnson [9] asks whether this problem is NP-hard even in the case of 3 machines and unit-length jobs. In a recent breakthrough, Levey and Rothvoss [24] gave a (1 + ϵ)-approximation algorithm, which runs in nearly quasi-polynomial time, for the case when job have unit lengths. However, a substantially more difficult case where jobs have arbitrary processing lengths has remained open. We make progress on this more general problem. We show that there exists a (1 + ϵ)-approximation algorithm (with similar running time as that of [24]) for the nonmigratory setting: when every job has to be scheduled entirely on a single machine, but within a machine the job need not be scheduled during consecutive time steps. Further, we also show that our algorithmic framework generalizes to another classic scenario where, along with the precedence constraints, the jobs also have communication delay constraints. Both of these fundamental problems are highly relevant to the practice of datacenter scheduling.

问问这篇 Paper

智能体会读完全文。

Lune 把这篇 Paper 索引到了每一个公式,引用它的顶会 Paper 也一样。你提问,回答直接引用原文。

可以从这些问题问起

智能体调用

Luneget_paper_fulltext

在 Lune 里问

免费开始,无需绑卡

引用它的顶会 Paper3

问问它们各自怎么用它

相关 Paper

黄昏的海面,两侧是细线勾勒的悬崖