Lune

INFOCOM2023顶会

An Approximation for Job Scheduling on Cloud with Synchronization and Slowdown Constraints

Dejun Kong, Zhongrui Zhang, Yangguang Shi, Xiaofeng Gao

2023年份
2被引次数
1顶会引用

摘要

Cloud computing develops rapidly in recent years and provides service to many applications, in which job scheduling becomes more and more important to improve the quality of service. Parallel processing on cloud requires different machines starting simultaneously on the same job and brings processing slowdown due to communications overhead, defined as synchronization constraint and parallel slowdown. This paper investigates a new job scheduling problem of makespan minimization on uniform machines and identical machines with synchronization constraint and parallel slowdown. We first conduct complexity analysis proving that the problem is difficult in the face of adversarial job allocation. Then we propose a novel job scheduling algorithm, United Wrapping Scheduling (UWS), and prove that UWS admits an O(logm)-approximation for makespan minimization over m uniform machines. For the special case of identical machines, UWS is simplified to Sequential Allocation, Refilling and Immigration algorithm (SARI), proved to have a constant approximation ratio of 8 (tight up to a factor of 4). Performance evaluation implies that UWS and SARI have better makespan and realistic approximation ratio of 2 compared to baseline methods United-LPT and FIFO, and lower bounds.

问问这篇 Paper

问问你的智能体。

Lune 读过与它相关的顶会 Paper,每个回答都会注明依据哪几篇。

可以从这些问题问起

智能体调用

Lunesearch_papers

在 Lune 里问

免费开始,无需绑卡

lune papers get 2bc2e9af-46d7-41c0-8138-dea2efbbf733

引用它的顶会 Paper1

问问它们各自怎么用它

相关 Paper

黄昏的海面,两侧是细线勾勒的悬崖