Lune

SIGMOD2021顶会

Public Transport Planning: When Transit Network Connectivity Meets Commuting Demand

Sheng Wang, Yuan Sun, Christopher Musco, Zhifeng Bao

2021年份
21被引次数
6顶会引用

摘要

In this paper, we make a first attempt to incorporate both commuting demand and transit network connectivity in bus route planning (CT-Bus), and formulate it as a constrained optimization problem: planning a new bus route with k edges over an existing transit network without building new bus stops to maximize a linear aggregation of commuting demand and connectivity of the transit network. We prove the NP-hardness of CT-Bus and propose an expansion-based greedy algorithm that iteratively scans potential candidate paths in the network. To boost the efficiency of computing the connectivity of new networks with candidate paths, we convert it to a matrix trace estimation problem and employ a Lanczos method to estimate the natural connectivity of the transit network with a guaranteed error bound. Furthermore, we derive upper bounds on the objective values and use them to greedily select candidates for expansion. Our experiments conducted on real-world transit networks in New York City and Chicago verify the efficiency, effectiveness, and scalability of our algorithms.

问问这篇 Paper

智能体会读完全文。

Lune 把这篇 Paper 索引到了每一个公式,引用它的顶会 Paper 也一样。你提问,回答直接引用原文。

可以从这些问题问起

智能体调用

Luneget_paper_fulltext

在 Lune 里问

免费开始,无需绑卡

引用它的顶会 Paper6

问问它们各自怎么用它

它引用的顶会 Paper5

相关 Paper

黄昏的海面,两侧是细线勾勒的悬崖