Lune

STOC2021顶会

A (2 + ε)-approximation algorithm for preemptive weighted flow time on a single machine

Lars Rohwedder, Andreas Wiese

2021年份
4被引次数
3顶会引用

摘要

Weighted flow time is a fundamental and very well-studied objective function in scheduling. In this paper, we study the setting of a single machine with preemptions. The input consists of a set of jobs, characterized by their processing times, release times, and weights and we want to compute a (possibly preemptive) schedule for them. The objective is to minimize the sum of the weighted flow times of the jobs, where the flow time of a job is the time between its release date and its completion time.

It had been a long-standing open problem to find a polynomial time O(1)-approximation algorithm for this setting. In a recent break-through result, Batra, Garg, and Kumar (FOCS 2018) found such an algorithm if the input data are polynomially bounded integers, and Feige, Kulkarni, and Li (SODA 2019) presented a black-box reduction to this setting. The resulting approximation ratio is a (not explicitly stated) constant which is at least 10.000. In this paper we improve this ratio to 2 + ε. The algorithm by Batra, Garg, and Kumar (FOCS 2018) reduces the problem to DEMAND MULTICUT ON TREES and solves the resulting instances via LP-rounding and a dynamic program. Instead, we first reduce the problem to a (different) geometric problem while losing only a factor 1 + ε, and then solve its resulting instances up to a factor of 2 + ε by a dynamic program. In particular, our reduction ensures certain structural properties, thanks to which we do not need LP-rounding methods.

We believe that our result makes substantial progress towards finding a PTAS for weighted flow time on a single machine.

问问这篇 Paper

智能体会读完全文。

Lune 把这篇 Paper 索引到了每一个公式,引用它的顶会 Paper 也一样。你提问,回答直接引用原文。

可以从这些问题问起

智能体调用

Luneget_paper_fulltext

在 Lune 里问

免费开始,无需绑卡

引用它的顶会 Paper3

问问它们各自怎么用它

相关 Paper

黄昏的海面,两侧是细线勾勒的悬崖