A (2 + ε)-approximation algorithm for preemptive weighted flow time on a single machine

Lars Rohwedder, Andreas Wiese

摘要

Weighted flow time is a fundamental and very well-studied objective function in scheduling. In this paper, we study the setting of a single machine with preemptions. The input consists of a set of jobs, characterized by their processing times, release times, and weights and we want to compute a (possibly preemptive) schedule for them. The objective is to minimize the sum of the weighted flow times of the jobs, where the flow time of a job is the time between its release date and its completion time.

It had been a long-standing open problem to find a polynomial time O(1)-approximation algorithm for this setting. In a recent break-through result, Batra, Garg, and Kumar (FOCS 2018) found such an algorithm if the input data are polynomially bounded integers, and Feige, Kulkarni, and Li (SODA 2019) presented a black-box reduction to this setting. The resulting approximation ratio is a (not explicitly stated) constant which is at least 10.000. In this paper we improve this ratio to 2 + ε. The algorithm by Batra, Garg, and Kumar (FOCS 2018) reduces the problem to DEMAND MULTICUT ON TREES and solves the resulting instances via LP-rounding and a dynamic program. Instead, we first reduce the problem to a (different) geometric problem while losing only a factor 1 + ε, and then solve its resulting instances up to a factor of 2 + ε by a dynamic program. In particular, our reduction ensures certain structural properties, thanks to which we do not need LP-rounding methods.

We believe that our result makes substantial progress towards finding a PTAS for weighted flow time on a single machine.

问 Lune

几分钟读透这篇 Paper,不用再花一下午。

Lune 能读完全文,也能读引用它的顶会 Paper,讲清它的结论、证据和局限,每一点都注明出自哪篇 Paper。不用硬啃,也不靠猜。

已有 3 篇顶会 Paper 引用了它。别等审稿人问起,先弄清它们发现了什么。

可以从这些问题问起

Lune 可以查阅

全文 · 引用它的顶会 Paper · 相关的 Paper

获取答案

免费开始,无需绑卡

脉络

  • A (2 + ε)-approximation algorithm for the general scheduling problem in quasipolynomial time 引用了 A PTAS for Minimizing Weighted Flow Time on a Single Machine
它引用的引用它的从左到右按年份排列,引用越多,位置越高。

引用它的顶会 Paper3

  1. Flow time scheduling and prefix Beck-FialaNikhil Bansal, Lars Rohwedder, Ola SvenssonSTOC 2022 · 8 次引用
  2. A (2 + ε)-approximation algorithm for the general scheduling problem in quasipolynomial timeAlexander Armbruster, Lars Rohwedder, Andreas WieseSODA 2026
  3. A PTAS for Minimizing Weighted Flow Time on a Single MachineAlexander Armbruster, Lars Rohwedder, Andreas WieseSTOC 2023

相关 Paper

  1. Improved Approximation Algorithms for Non-preemptive Throughput MaximizationAlexander Armbruster, Fabrizio Grandoni, Antoine Tinguely, Andreas WieseSTOC 2026 · 1 次引用
  2. Non-uniform Geometric Set Cover and Scheduling on Multiple MachinesNikhil Bansal, Jatin BatraSODA 2021 · 4 次引用
  3. Flow time scheduling with uncertain processing timeYossi Azar, Stefano Leonardi, Noam TouitouSTOC 2021
  4. Minimizing Completion Times for Stochastic Jobs via Batched Free TimesAnupam Gupta, Benjamin Moseley, Rudy ZhouSODA 2023 · 1 次引用
  5. Scheduling with Communication Delays via LP Hierarchies and Clustering II: Weighted Completion Times on Related MachinesSami Davies, Janardhan Kulkarni, Thomas Rothvoss, Jakub Tarnawski 等SODA 2021 · 15 次引用
黄昏的海面,两侧是细线勾勒的悬崖