Lune

STOC2023顶会

A PTAS for Minimizing Weighted Flow Time on a Single Machine

Alexander Armbruster, Lars Rohwedder, Andreas Wiese

2023年份
2顶会引用

摘要

An important objective in scheduling literature is to minimize the sum of weighted flow times. We are given a set of jobs where each job is characterized by a release time, a processing time, and a weight. Our goal is to find a preemptive schedule on a single machine that minimizes the sum of the weighted flow times of the jobs, where the flow time of a job is the time between its completion time and its release time. The currently best known polynomial time algorithm for the problem is a (2 + ε)-approximation by Rohwedder and Wiese [STOC 2021] which builds on the prior break-through result by Batra, Garg, and Kumar [FOCS 2018] who found the first pseudo-polynomial time constant factor approximation algorithm for the problem, and on the result by Feige, Kulkarni, and Li [SODA 2019] who turned the latter into a polynomial time algorithm. However, it remains open whether the problem admits a PTAS.

We answer this question in the affirmative and present a polynomial time (1 + ε)-approximation algorithm for weighted flow time on a single machine. We rely on a reduction of the problem to a geometric covering problem, which was introduced in the mentioned (2 + ε)-approximation algorithm, losing a factor 1 + ε in the approximation ratio. However, unlike that algorithm, we solve the resulting instances of this problem exactly, rather than losing a factor 2 + ε. Key for this is to identify and exploit structural properties of instances of the geometric covering problem which arise in the reduction from weighted flow time.

问问这篇 Paper

智能体会读完全文。

Lune 把这篇 Paper 索引到了每一个公式,引用它的顶会 Paper 也一样。你提问,回答直接引用原文。

可以从这些问题问起

智能体调用

Luneget_paper_fulltext

在 Lune 里问

免费开始,无需绑卡

引用它的顶会 Paper2

问问它们各自怎么用它

它引用的顶会 Paper1

相关 Paper

黄昏的海面,两侧是细线勾勒的悬崖