Lune

SODA2021Top-tier venue

New Techniques and Fine-Grained Hardness for Dynamic Near-Additive Spanners

Thiago Bergamaschi, Monika Henzinger, Maximilian Probst Gutenberg, Virginia Vassilevska Williams, Nicole Wein

2021Year
19Citations
8Top-tier citations

Abstract

Maintaining and updating shortest paths information in a graph is a fundamental problem with many applications. As computations on dense graphs can be prohibitively expensive, and it is preferable to perform the computations on a sparse skeleton of the given graph that roughly preserves the shortest paths information. Spanners and emulators serve this purpose. Unfortunately, very little is known about dynamically maintaining sparse spanners and emulators as the graph is modified by a sequence of edge insertions and deletions. This paper develops fast dynamic algorithms for spanner and emulator maintenance and provides evidence from fine-grained complexity that these algorithms are tight. For unweighted undirected m-edge n-node graphs we obtain the following results.

Under the popular OMv conjecture, there can be no decremental or incremental algorithm that maintains an n 1+o(1) edge (purely additive) +n δ -emulator for any δ < 1/2 with arbitrary polynomial preprocessing time and total update time m 1+o(1) . Also, under the Combinatorial k-Clique hypothesis, any fully dynamic combinatorial algorithm that maintains an n 1+o(1) edge (1 + , n o(1) )-spanner or emulator for small must either have preprocessing time mn 1-o(1) or amortized update time m 1-o(1) . Both of our conditional lower bounds are tight.

As the above fully dynamic lower bound only applies to combinatorial algorithms, we also develop an algebraic spanner algorithm that improves over the m 1-o(1) update time for dense graphs. For any constant ∈ (0, 1], there is a fully dynamic algorithm with worst-case update time O(n 1.529 ) that whp maintains an n 1+o(1) edge (1 + , n o(1) )-spanner.

Our new algebraic techniques allow us to also obtain a new fully dynamic algorithm for All-Pairs Shortest Paths (APSP) that can perform both edge updates and can report shortest paths in worst-case time O(n 1.9 ), which are correct whp. This is the first path-reporting fully dynamic APSP algorithm with a truly subquadratic query time that beats O(n 2.5 ) update time. It works against an oblivious adversary.

Finally, we give two applications of our new dynamic spanner algorithms: (1) a fully dynamic (1+ )approximate APSP algorithm with update time O(n 1.529 ) that can report approximate shortest paths in n 1+o(1) time per query; previous subquadratic update/query algorithms could only report the distance, but not obtain the paths; (2) a fully dynamic algorithm for near-2-approximate Steiner tree maintenance with both terminal and edge updates.

Ask about this paper

Your agent reads all of it.

Lune indexed this paper to the last equation, along with the top-tier papers that cite it. Ask a question and the answer quotes them.

Questions to start from

Your agent calls

Luneget_paper_fulltext

Ask in Lune

Free to start. No credit card required.

lune papers fulltext 4c10e25f-e9a5-43be-ae18-1f6aa50ee12f

Cited by top-tier papers8

Ask how each one uses it

Builds on6

Related papers

Dusk over the sea between two cliffs drawn in fine vertical lines