Subtask-Level Elastic Scheduling

Marion Sudvarg, Daisy Wang, Jeremy Buhler, Chris Gill

2024年份
1被引次数

摘要

Buttazzo et al.’s elastic scheduling model allows task utilizations to be “compressed” to ensure schedulability atop limited resources. Each task is assigned a range of acceptable utilizations and an “elastic constant” representing the relative adaptability of its utilization. In this paper, we consider federated scheduling, under which each high-utilization parallel task is assigned dedicated processor cores. We propose a new model of elastic workload compression for parallel DAG tasks that assigns each subtask its own elastic constant and continuous range of acceptable workloads. We show that the problem can be solved offline as a mixed-integer quadratic program, or online using a pseudo-polynomial dynamic programming algorithm. We also consider joint core allocation and compression of low-utilization sequential tasks and present a mixed-integer linear program for optimal elastic compression of tasks under partitioned EDF scheduling. We show empirical improvements in schedulability over the prior work and present a case study for the Fast Integrated Mobility Spectrometer (FIMS).

问问这篇 Paper

智能体会读完全文。

Lune 把这篇 Paper 索引到了最后一个公式,引用它的顶会 Paper 也一样。你提问,回答直接引用原文。

可以从这些问题问起

智能体调用

Luneget_paper_fulltext

在 Lune 里问

免费开始,无需绑卡

lune papers fulltext 523eb02e-25ef-4b3e-a42d-798ddd79aab4

它引用的顶会 Paper2

相关 Paper

黄昏的海面,两侧是细线勾勒的悬崖