Lune

DAC2023顶会

ADAPTIVE: Agent-Based Learning for Bounding Time in Mixed-Criticality Systems

Behnaz Ranjbar, Ali Hosseinghorban, Akash Kumar

摘要

In Mixed-Criticality (MC) systems, the high Worst-Case Execution Time (WCET) of a task is a pessimistic bound, the maximum execution time of the task under all circumstances, while the low WCET should be close to the actual execution time of most instances of the task to improve utilization and Quality-of-Service (QoS). Most MC systems consider a static low WCET for each task which cannot adapt to dynamism at run-time. In this regard, we consider the run-time behavior of tasks and propose a learning-based approach that dynamically monitors the tasks’ execution times and adapts the low WCETs to determine the ideal trade-off between mode-switches, utilization, and QoS. Based on our observations on running embedded real-time benchmarks on a real platform, the proposed scheme improves the QoS by 16.4% on average while reducing the utilization waste by 17.7%, on average, compared to state-of-the-art works.

问 Lune

几分钟读透这篇 Paper,不用再花一下午。

Lune 能读完全文,也能读引用它的顶会 Paper,讲清它的结论、证据和局限,每一点都注明出自哪篇 Paper。不用硬啃,也不靠猜。

可以从这些问题问起

Lune 可以查阅

全文 · 相关的 Paper

获取答案

免费开始,无需绑卡

相关 Paper

  1. Mixed-Criticality Scheduling in Compositional Real-Time Systems with Multiple Budget EstimatesKecheng Yang, Zheng DongRTSS 2020 · 11 次引用
  2. Mixed-Criticality Scheduling of Energy-Harvesting SystemsKankan Wang, Qingxu DengRTSS 2022 · 2 次引用
  3. HIART-MCS: High Resilience and Approximated Computing Architecture for Imprecise Mixed-Criticality SystemsZhe Jiang, Xiaotian Dai, Neil C. AudsleyRTSS 2021 · 8 次引用
  4. Schedulability Analysis for Adaptive Mixed Criticality Systems with Arbitrary Deadlines and Semi-ClairvoyanceAlan Burns, Robert I. DavisRTSS 2020 · 13 次引用
  5. Pythia-MCS: Enabling Quarter-Clairvoyance in I/O-Driven Mixed-Criticality SystemsZhe Jiang, Kecheng Yang, Nathan Fisher, Neil C. Audsley 等RTSS 2020 · 10 次引用
黄昏的海面,两侧是细线勾勒的悬崖