Lune

NeurIPS2025顶会

Heterogeneous Graph Transformers for Simultaneous Mobile Multi-Robot Task Allocation and Scheduling under Temporal Constraints

Batuhan Altundas, Shengkang Chen, Shivika Singh, Shivangi Deo, Minwoo Cho, Matthew Gombolay

2025年份
1被引次数

摘要

Coordinating large teams of heterogeneous mobile agents to perform complex tasks efficiently has scalability bottlenecks in feasible and optimal task scheduling, with critical applications in logistics, manufacturing, and disaster response. Existing task allocation and scheduling methods, including heuristics and optimization-based solvers, often fail to scale and overlook inter-task dependencies and agent heterogeneity. We propose a novel Simultaneous Decision-Making model for Heterogeneous Multi-Agent Task Allocation and Scheduling (HM-MATAS), built on a Residual Heterogeneous Graph Transformer with edge and node-level attention. Our model encodes agent capabilities, travel times, and temporospatial constraints into a rich graph representation and is trainable via reinforcement learning. Trained on small-scale problems (10 agents, 20 tasks), our model generalizes effectively to significantly larger scenarios (up to 40 agents and 200 tasks), enabling fast, one-shot task assignment and scheduling. Our simultaneous model outperforms classical heuristics by assigning 164.10% more feasible tasks given temporal constraints in 3.83% of the time, metaheuristics by 201.54% in 0.01% of the time and exact solver by 231.73% in 0.03% of the time, while achieving 20 × -to- 250 × speedup from prior graph-based methods across scales.

问问这篇 Paper

智能体会读完全文。

Lune 把这篇 Paper 索引到了每一个公式,引用它的顶会 Paper 也一样。你提问,回答直接引用原文。

可以从这些问题问起

智能体调用

Luneget_paper_fulltext

在 Lune 里问

免费开始,无需绑卡

它引用的顶会 Paper4

相关 Paper

黄昏的海面,两侧是细线勾勒的悬崖