The SoftCumulative Constraint with Quadratic Penalty
摘要
The Cumulative constraint greatly contributes to the success of constraint programming at solving scheduling problems. The SoftCumulative, a version of the Cumulative where overloading the resource incurs a penalty is, however, less studied. We introduce a checker and a filtering algorithm for the SoftCumulative, which are inspired by the powerful energetic reasoning rule for the Cumulative. Both algorithms can be used with classic linear penalty function, but also with a quadratic penalty function, where the penalty of overloading the resource increases quadratically with the amount of the overload. We show that these algorithms are more general than existing algorithms and vastly outperform a decomposition of the SoftCumulative in practice.
问 Lune
几分钟读透这篇 Paper,不用再花一下午。
Lune 能读完全文,也能读引用它的顶会 Paper,讲清它的结论、证据和局限,每一点都注明出自哪篇 Paper。不用硬啃,也不靠猜。
相关 Paper
- A modular cost analysis for probabilistic programsMartin Avanzini, Georg Moser, Michael SchaperOOPSLA 2020 · 41 次引用
- IPO: Interior-Point Policy Optimization under ConstraintsYongshuai Liu, Jiaxin Ding, Xin LiuAAAI 2020 · 231 次引用
- Qualitative Controller Synthesis for Consumption Markov Decision ProcessesFrantisek Blahoudek, Tomás Brázdil, Petr Novotný, Melkior Ornik 等CAV 2020 · 9 次引用
- Fair Scheduling for Time-dependent ResourcesBo Li, Minming Li, Ruilong ZhangNeurIPS 2021 · 23 次引用
- Towards PTAS for Precedence Constrained Scheduling via Combinatorial AlgorithmsShi LiSODA 2021 · 5 次引用
