Lune

SODA2020顶会

Weighted Completion Time Minimization for Unrelated Machines via Iterative Fair Contention Resolution

Sungjin Im, Maryam Shadloo

摘要

We give a 1.488-approximation for the classic scheduling problem of minimizing total weighted completion time on unrelated machines. This is a considerable improvement on the recent breakthrough of (1.5 – 10−7)-approximation (STOC 2016, Bansal-Srinivasan-Svensson) and the follow-up result of (1.5 – 1/6000)-approximation (FOCS 2017, Li). Bansal et al. introduced a novel rounding scheme yielding strong negative correlations for the first time and applied it to the scheduling problem to obtain their breakthrough, which resolved the open problem if one can beat out the long-standing 1.5-approximation barrier based on independent rounding. Our key technical contribution is in achieving significantly stronger negative correlations via iterative fair contention resolution, which is of independent interest. Previously, Bansal et al. obtained strong negative correlations via a variant of pipage type rounding and Li used it as a black box.

问 Lune

几分钟读透这篇 Paper,不用再花一下午。

Lune 能读完全文,也能读引用它的顶会 Paper,讲清它的结论、证据和局限,每一点都注明出自哪篇 Paper。不用硬啃,也不靠猜。

已有 2 篇顶会 Paper 引用了它。别等审稿人问起,先弄清它们发现了什么。

可以从这些问题问起

Lune 可以查阅

全文 · 引用它的顶会 Paper · 相关的 Paper

获取答案

免费开始,无需绑卡

脉络

  • Selfish, Local and Online Scheduling via Vector Fitting 引用了 Dependent rounding with strong negative-correlation, and scheduling on unrelated machines to minimize completion time
它引用的引用它的从左到右按年份排列,引用越多,位置越高。

引用它的顶会 Paper2

  1. Dependent rounding with strong negative-correlation, and scheduling on unrelated machines to minimize completion timeDavid G. HarrisSODA 2024 · 1 次引用
  2. Selfish, Local and Online Scheduling via Vector FittingDanish KashaevSODA 2026

相关 Paper

  1. Approximating Unrelated Machine Weighted Completion Time Using Iterative Rounding and Computer Assisted ProofsShi LiSODA 2025 · 4 次引用
  2. Improved Approximations for Unrelated Machine SchedulingSungjin Im, Shi LiSODA 2023 · 6 次引用
  3. Settling the Maximin Share Fairness for Scheduling among Groups of MachinesBo Li, Fangxiao Wang, Shiji XingICML 2025
  4. Scheduling with Communication Delays via LP Hierarchies and Clustering II: Weighted Completion Times on Related MachinesSami Davies, Janardhan Kulkarni, Thomas Rothvoss, Jakub Tarnawski 等SODA 2021 · 15 次引用
  5. Minimizing Completion Times for Stochastic Jobs via Batched Free TimesAnupam Gupta, Benjamin Moseley, Rudy ZhouSODA 2023 · 1 次引用
黄昏的海面,两侧是细线勾勒的悬崖