Lune

RTSS2021顶会

Suspension-Aware Fixed-Priority Schedulability Test with Arbitrary Deadlines and Arrival Curves

Mario Günzel, Niklas Ueter, Jian-Jia Chen

2021年份
10被引次数
1顶会引用

摘要

In real-time scheduling theory, self-suspension describes the behavior that a job can suspend itself from the ready state and thus be exempted from the scheduling for the suspension duration. This behavior makes it non-trivial to resort to established concepts such as the busy-interval analysis to self-suspending task sets which is required to analyze the worst-case response time of tasks with backlog, e.g., arbitrary-deadline task sets. In this paper, we present a novel suspension-aware busy-interval analysis for dynamic self-suspension tasks where the inter-arrival time of subsequent jobs can be bounded by an arrival curve. Based on the general analysis, we provide worst-case response time analyses and hence sufficient schedulability tests for fixed-priority preemptive uniprocessor scheduling algorithms for arrival-curve constrained and sporadic self-suspension task systems with arbitrary deadlines. Moreover, we provide evaluations based on synthetically generated task sets that show that our method indeed exploits the optimism that is introduced when enlarging the relative deadline of tasks. We demonstrate that our approach improves the state of the art by considering arrival curves that are obtained from tasks with release jitter.

问问这篇 Paper

问问你的智能体。

Lune 读过与它相关的顶会 Paper,每个回答都会注明依据哪几篇。

可以从这些问题问起

智能体调用

Lunesearch_papers

在 Lune 里问

免费开始,无需绑卡

lune papers get 06754a90-3c73-40f9-8a11-51cd2a6d6d00

引用它的顶会 Paper1

问问它们各自怎么用它

相关 Paper

黄昏的海面,两侧是细线勾勒的悬崖