Lune

INFOCOM2021Top-tier venue

Reusing Backup Batteries as BESS for Power Demand Reshaping in 5G and Beyond

Guoming Tang, Hao Yuan, Deke Guo, Kui Wu, Yi Wang

2021Year
24Citations

Abstract

The mobile network operators are upgrading their network facilities and shifting to the 5G era at an unprecedented pace. The huge operating expense (OPEX), mainly the energy consumption cost, has become the major concern of the operators. In this work, we investigate the energy cost-saving potential by transforming the backup batteries of base stations (BSs) to a distributed battery energy storage system (BESS). Specifically, to minimize the total energy cost, we model the distributed BESS discharge/charge scheduling as an optimization problem by incorporating comprehensive practical considerations. Then, considering the dynamic BS power demands in practice, we propose a deep reinforcement learning (DRL) based approach to make BESS scheduling decisions in real-time. The experiments using real-world BS deployment and traffic load data demonstrate that with our DRL-based BESS scheduling, the peak power demand charge of BSs can be reduced by up to 26.59%, and the yearly OPEX saving for 2, 282 5G BSs could reach up to US$185, 000.

Ask about this paper

Your agent reads all of it.

Lune indexed this paper to the last equation, along with the top-tier papers that cite it. Ask a question and the answer quotes them.

Questions to start from

Your agent calls

Luneget_paper_fulltext

Ask in Lune

Free to start. No credit card required.

lune papers fulltext cd5bf71f-52df-4275-81a1-9c0b11d59127

Related papers

Dusk over the sea between two cliffs drawn in fine vertical lines