Lune

SODA2026Top-tier venue

Online Joint Replenishment Problem with Arbitrary Holding and Backlog Costs

Yossi Azar, Shahar Lewkowicz

Abstract

In their seminal paper Moseley, Niaparast, and Ravi introduced the Joint Replenishment Problem (JRP) with holding and backlog costs that models the trade-off between ordering costs, holding costs, and backlog costs in supply chain planning systems. Their model generalized the classical make-to-order version as well maketo-stock version. For the case where holding costs function of all items are the same and all backlog costs are the same, they provide a constant competitive algorithm, leaving designing a constant competitive algorithm for arbitrary functions open. Moreover, they noticed that their algorithm does not work for arbitrary (request dependent) holding costs and backlog costs functions. We resolve their open problem and design a constant competitive algorithm that works for arbitrary request dependent functions. Specifically, we establish a 4-competitive algorithm for the single-item case and a 16-competitive for the general (multi-item) version. The algorithm of Moseley, Niaparast, and Ravi is based on fixed priority on the requests to items, and request to an item are always served by order of deadlines. In contrast, we design an algorithm with dynamic priority over the requests such that instead of servicing a prefix by deadline of requests, we may need to service a general subset of the requests.

Ask Lune

Know this paper in minutes, not an afternoon.

Lune can read every page of it and the top-tier papers that cite it, and gives you its claims, its evidence and its limits, each one cited to the paper it comes from. No skimming, no AI slop.

1 top-tier paper has cited it since. Know what they found before your reviewers do.

Questions to start from

Lune can draw on

the full paper · the top-tier papers that cite it · related work

Get the answer

Free to start. No credit card required.

Lineage

  • Putting Off the Catching Up: Online Joint Replenishment Problem with Holding and Backlog Costs cites Improved and Deterministic Online Service with Deadlines or Delay
  • Improved Online Algorithms for Inventory Management Problems with Holding and Delay Costs: Riding the Wave Makes Things Simpler, Stronger, & More General cites Putting Off the Catching Up: Online Joint Replenishment Problem with Holding and Backlog Costs
Builds onCited byLeft to right by year; the more cited, the higher.

Cited by top-tier papers1

  1. Improved Online Algorithms for Inventory Management Problems with Holding and Delay Costs: Riding the Wave Makes Things Simpler, Stronger, & More GeneralDavid B. Shmoys, Varun Suriyanarayana, Seeun William UmbohSODA 2026 · 5 citations

Builds on2

  1. Improved and Deterministic Online Service with Deadlines or DelayNoam TouitouSTOC 2023 · 4 citations
  2. Putting Off the Catching Up: Online Joint Replenishment Problem with Holding and Backlog CostsBenjamin Moseley, Aidin Niaparast, R. RaviSODA 2025 · 1 citation

Related papers

  1. Improved Approximation Algorithms for the Joint Replenishment Problem with Outliers, and with Fairness ConstraintsVarun Suriyanarayana, Varun Sivashankar, Siddharth Gollapudi, David B. ShmoysSODA 2024
  2. The Power of Clairvoyance for Multi-Level Aggregation and Set Cover with DelayNgoc Mai Le, Seeun William Umboh, Ningyuan XieSODA 2023 · 4 citations
  3. Non-uniform Geometric Set Cover and Scheduling on Multiple MachinesNikhil Bansal, Jatin BatraSODA 2021 · 4 citations
  4. Online Resource Allocation with Concave, Diminishing-Returns ObjectivesKalen PattonSODA 2026 · 3 citations
  5. Almost Tight Bounds for Online Facility Location in the Random-Order ModelHaim Kaplan, David Naori, Danny RazSODA 2023 · 8 citations
Dusk over the sea between two cliffs drawn in fine vertical lines