Lune

SODA2020Top-tier venue

Hierarchy-Based Algorithms for Minimizing Makespan under Precedence and Communication Constraints

Janardhan Kulkarni, Shi Li, Jakub Tarnawski, Minwei Ye

Abstract

We consider the classic problem of scheduling jobs with precedence constraints on a set of identical machines to minimize the makespan objective function. Understanding the exact approximability of the problem when the number of machines is a constant is a well-known question in scheduling theory. Indeed, an outstanding open problem from the classic book of Garey and Johnson [9] asks whether this problem is NP-hard even in the case of 3 machines and unit-length jobs. In a recent breakthrough, Levey and Rothvoss [24] gave a (1 + ϵ)-approximation algorithm, which runs in nearly quasi-polynomial time, for the case when job have unit lengths. However, a substantially more difficult case where jobs have arbitrary processing lengths has remained open. We make progress on this more general problem. We show that there exists a (1 + ϵ)-approximation algorithm (with similar running time as that of [24]) for the nonmigratory setting: when every job has to be scheduled entirely on a single machine, but within a machine the job need not be scheduled during consecutive time steps. Further, we also show that our algorithmic framework generalizes to another classic scenario where, along with the precedence constraints, the jobs also have communication delay constraints. Both of these fundamental problems are highly relevant to the practice of datacenter scheduling.

Ask Lune

Know this paper in minutes, not an afternoon.

Lune can read every page of it and the top-tier papers that cite it, and gives you its claims, its evidence and its limits, each one cited to the paper it comes from. No skimming, no AI slop.

3 top-tier papers have cited it since. Know what they found before your reviewers do.

Questions to start from

Lune can draw on

the full paper · the top-tier papers that cite it · related work

Get the answer

Free to start. No credit card required.

Lineage

  • On the Hardness of Scheduling With Non-Uniform Communication Delays cites Scheduling Precedence-Constrained Jobs on Related Machines with Communication Delay
  • On the Hardness of Scheduling With Non-Uniform Communication Delays cites Scheduling with Communication Delays via LP Hierarchies and Clustering
Builds onCited byLeft to right by year; the more cited, the higher.

Cited by top-tier papers3

  1. Scheduling Precedence-Constrained Jobs on Related Machines with Communication DelayBiswaroop Maiti, Rajmohan Rajaraman, David Stalfa, Zoya Svitkina et al.FOCS 2020 · 14 citations
  2. Scheduling with Communication Delays via LP Hierarchies and ClusteringSami Davies, Janardhan Kulkarni, Thomas Rothvoss, Jakub Tarnawski et al.FOCS 2020 · 10 citations
  3. On the Hardness of Scheduling With Non-Uniform Communication DelaysSami Davies, Janardhan Kulkarni, Thomas Rothvoss, Sai Sandeep et al.SODA 2022 · 4 citations

Related papers

  1. A Subexponential Time Algorithm for Makespan Scheduling of Unit Jobs with Precedence ConstraintsJesper Nederlof, Céline M. F. Swennenhuis, Karol WegrzyckiSODA 2025
  2. Towards PTAS for Precedence Constrained Scheduling via Combinatorial AlgorithmsShi LiSODA 2021 · 5 citations
  3. Scheduling with Communication Delays via LP Hierarchies and Clustering II: Weighted Completion Times on Related MachinesSami Davies, Janardhan Kulkarni, Thomas Rothvoss, Jakub Tarnawski et al.SODA 2021 · 15 citations
  4. Tight running times for minimum ℓq-norm load balancing: beyond exponential dependencies on 1/∊Lin Chen, Liangde Tao, José VerschaeSODA 2022 · 1 citation
  5. Improved Approximation Algorithms for Non-preemptive Throughput MaximizationAlexander Armbruster, Fabrizio Grandoni, Antoine Tinguely, Andreas WieseSTOC 2026 · 1 citation
Dusk over the sea between two cliffs drawn in fine vertical lines