Weighted Completion Time Minimization for Unrelated Machines via Iterative Fair Contention Resolution
Sungjin Im, Maryam Shadloo
Abstract
We give a 1.488-approximation for the classic scheduling problem of minimizing total weighted completion time on unrelated machines. This is a considerable improvement on the recent breakthrough of (1.5 – 10−7)-approximation (STOC 2016, Bansal-Srinivasan-Svensson) and the follow-up result of (1.5 – 1/6000)-approximation (FOCS 2017, Li). Bansal et al. introduced a novel rounding scheme yielding strong negative correlations for the first time and applied it to the scheduling problem to obtain their breakthrough, which resolved the open problem if one can beat out the long-standing 1.5-approximation barrier based on independent rounding. Our key technical contribution is in achieving significantly stronger negative correlations via iterative fair contention resolution, which is of independent interest. Previously, Bansal et al. obtained strong negative correlations via a variant of pipage type rounding and Li used it as a black box.
Ask about this paper
Your agent reads all of it.
Lune indexed this paper to the last equation, along with the top-tier papers that cite it. Ask a question and the answer quotes them.
Your agent calls
Luneget_paper_fulltext
Free to start. No credit card required.
Terminal
Install the CLIlune papers fulltext 0af97f45-1757-43cc-8ed5-6b799bfd612dCited by top-tier papers2
- Dependent rounding with strong negative-correlation, and scheduling on unrelated machines to minimize completion timeDavid G. HarrisSODA 2024 · 1 citation
- Selfish, Local and Online Scheduling via Vector FittingDanish KashaevSODA 2026
Related papers
- Approximating Unrelated Machine Weighted Completion Time Using Iterative Rounding and Computer Assisted ProofsShi LiSODA 2025 · 4 citations
- Improved Approximations for Unrelated Machine SchedulingSungjin Im, Shi LiSODA 2023 · 6 citations
- Settling the Maximin Share Fairness for Scheduling among Groups of MachinesBo Li, Fangxiao Wang, Shiji XingICML 2025
- Scheduling with Communication Delays via LP Hierarchies and Clustering II: Weighted Completion Times on Related MachinesSami Davies, Janardhan Kulkarni, Thomas Rothvoss, Jakub Tarnawski et al.SODA 2021 · 15 citations
- Minimizing Completion Times for Stochastic Jobs via Batched Free TimesAnupam Gupta, Benjamin Moseley, Rudy ZhouSODA 2023 · 1 citation
